Keystone Engineering – Townsends Co-Op

Georgetown, DE – A food growing and processing co-op required a wastewater treatment system to remove solids in their wash water, prior to discharge to the POTW.

FRC engineers designed a custom aeration header, skimmer assembly and sludge auger system that would fit over an existing concrete basin. The results were pretty fantastic.

Solution Provided

Wastewater Inlet Distribution Header

Skimmer Assembly

Sludge Ramp w/ Trough and Auger

Mechanical and Process Engineering