FRC was the choice of a leading copacker of sandwiches and deli spreads for a complete turnkey solution. Our scope consisted of the design of the wastewater treatment system and the mechanical and electrical installation of the new system, giving the client a one supplier solution. This facility produces between 12,000 to 15,000 gallons per […]
Read MoreFRC designed and supplied a full turnkey mechanical and electrical installation solution for this greenfield bakery manufacturer of rebranded muffins and gourmet iced cakes. The facility had to reduce the high levels of Total Suspended Solids (TSS) and Biochemical Oxygen Demand (BOD) in their wastewater to be able to discharge to a local water source. […]
Read MoreFRC was selected by a large privately owned US based cosmetics company to supply the wastewater treatment solution for a new manufacturing facility with expected wastewater volumes of approximately 215,000 gpd. FRC provided a turnkey solution including design, engineering, manufacture, and complete mechanical and electrical installation. The wastewater treatment system was designed to separate solids […]
Read MoreFRC was the choice of this Massachusetts based ice-cream purveyor for tackling their wastewater treatment needs. This facility generated wastewater at peak flows of 160 gpm. The FRC design sends wastewater from an existing equalization tank to the FRC DAF system for removal of Total Suspended Solids (TSS) and Fats, Oils, and Grease (FOG). The […]
Read More