Keystone Engineering – Townsends Co-Op

Georgetown, DE – A food growing and processing co-op required a wastewater treatment system to remove solids in their wash water, prior to discharge to the POTW.

FRC engineers designed a custom aeration header, skimmer assembly and sludge auger system that would fit over an existing concrete basin. The results were pretty fantastic.

Wastewater Inlet Distribution Header

Skimmer Assembly

Sludge Ramp w/ Trough and Auger

Mechanical and Process Engineering