One of the largest beef producers in North America was expanding their facility which increased their wastewater volume to 425,000 gpd at the site. FRC engineers designed a solution to upsize the entire wastewater treatment system including the existing primary DAF system and secondary DAF system to efficiently and cost effectively handle the added demand.